Làm bài · bản nhẹ

A2 RW Ch5 L3 · The Channel Tunnel 🚆🌊

Trang này dùng khi trang học trên máy không mở được. Số câu giống hệt trang học. Làm xong phần nào bấm «📤 Nộp phần này» — biết điểm ngay.
Phần 1/8 · Review · Lessons 1 & 2 · câu 1
Review · 🔄 What do you remember?

Lessons 1 & 2 — quick review

Ôn nhanh hai bài trước — nhớ lại rồi mới đi tiếp.
💬 Name four kinds of visual.
1Name four ways to use spatial order.
left → right · top → bottom · inside → outside · clockwisecause → effect → resultpast → present → future
💬 Where do adverbs of frequency go?
💬 What does a suffix do?
Phần 2/8 · Skill check · Visuals · câu 2
📘 Học trước khi làm · Before you read
Before you read · 💬 discuss

Two questions

🚇 A tunnel is a passage for cars or trains, built under the ground, under water, or through a mountain. Why are tunnels constructed? How do they benefit people?
🏗 What are some challenges in building a tunnel? Do you think building a tunnel is more difficult than building a bridge? Explain.
💭 Think of one challenge of building a tunnel. Think for 30 seconds — the teacher will call 2–3 students.
Nghĩ một thử thách khi xây đường hầm trong 30 giây — thầy gọi 2–3 em.
Skill check · before we read

Which of these are visuals? 🔎

Kiểm tra xem em đã nắm kỹ năng chưa, trước khi dùng nó vào bài thật.
2Tap all the correct answers. Careful — how many are right?
a · maps
b · essays
c · timelines
d · diagrams
e · letters
f · charts and tables
📝 Notes for discussion · not graded
Visuals can contain a lot of information. How can looking at visuals help you before, during, and after reading a text?
Phần 3/8 · Predict the text · câu —
🔮 Predict

“The Channel Tunnel: An International Engineering Marvel”

Nhìn tiêu đề và ảnh rồi ĐOÁN bài nói gì — chưa đọc chữ nào.
👀 Look at the map and the title only — do not read yet.
🔮 Guess · What is the topic?
how ferries cross the Channel
the history of train travel
building a tunnel between England and France
🔮 Guess · What is the main idea?
a · Swimming across the Channel is a popular sport.
b · Two countries worked together for years to build a tunnel under the sea.
c · Trains are cheaper than planes in Europe.
💡 Remember your prediction — we will check it after reading!
Phần 4/8 · 💡 Main idea · skim first · câu 3–6
The Channel Tunnel: An International Engineering Marvel

1Before 1994, if you wanted to go from France to England, you could make the 34-kilometer (21-mi.) trip across the English Channel by ferry or plane—or by swimming, if you enjoy adventure! For centuries, both the British and the French had thought about connecting the two countries with an underground tunnel. But fear of invasion and funding problems always stopped its construction. This changed in 1985 when the leaders of both countries had a contest to find a company that could plan, fund, and build a tunnel that would stretch the distance between the two countries.

2The engineering company Transmanche Link developed the winning plan. It planned for the construction of three tunnels, built next to each other. The northern tunnel was designed to bring people from England to France. The southern tunnel was to go from France to England. And an additional service tunnel—to be rarely used, only in case of an emergency—was to go in the middle. The estimated cost was $3.6 billion. Once the plan was approved, digging started from each side of the Channel.

3With the help of powerful tunnel boring machines, thousands of workers started digging below the ground. The dirt was moved to above ground before the cement was poured for the tunnel. Even with advanced technology, the work was often difficult. However, with the help of about 15,000 workers, the two sides met in December 1990, and the service tunnel was completed. However, workers never enjoyed a break because two more tunnels remained. The two sides finished the northern tunnel the following year and the southern tunnel a month after that. The digging was done, but then train tracks, electrical equipment, and train stations were needed. Finally, in May 1994, the Channel Tunnel opened. After ten years, $15 billion, and the deaths of ten workers, it was finally finished.

4Today, the Channel Tunnel, or Chunnel, as it is usually called, is 50 kilometers (31 mi) long—39 kilometers (24 mi) of it underwater—and 7 meters (23 ft) in diameter. At their deepest point, the tunnels are 75 meters (246 ft) below the seabed. About 500 trains a day, sometimes going as fast as 160 kilometers per hour (99 mph), move more than 50,000 people between the two countries. The trip takes a comfortable 35 minutes, a noticeable improvement over the 90-minute ferry ride.

Questions 3–6 · Matching headings
Questions 3–6 · Matching headings
Choose the correct heading for each paragraph, i–vi. There are more headings than paragraphs.
Skim: read the first and last sentence of each paragraph. Was your prediction right?
i · A long wait to join two countries
ii · The tunnel today: size, speed and passengers
iii · How much a ticket costs today
iv · A plan for three tunnels side by side
v · Why ferries are cheaper than trains
vi · Digging, difficulties and the opening
3Paragraph 1
i
ii
iii
iv
v
vi
4Paragraph 2
i
ii
iii
iv
v
vi
5Paragraph 3
i
ii
iii
iv
v
vi
6Paragraph 4
i
ii
iii
iv
v
vi
📝 Notes for discussion · not graded
1 · The Channel Tunnel was an international project between two countries. What are the benefits and challenges of two countries working together?
2 · This reading has a map, a timeline and a photo. What other visual could you add? What information would be in it?
Phần 5/8 · 📖 Read · Chunnel ¶1–2 · câu 7–9
The Channel Tunnel: An International Engineering Marvel

1Before 1994, if you wanted to go from France to England, you could make the 34-kilometer (21-mi.) trip across the English Channel by ferry or plane—or by swimming, if you enjoy adventure! For centuries, both the British and the French had thought about connecting the two countries with an underground tunnel. But fear of invasion and funding problems always stopped its construction. This changed in 1985 when the leaders of both countries had a contest to find a company that could plan, fund, and build a tunnel that would stretch the distance between the two countries.

2The engineering company Transmanche Link developed the winning plan. It planned for the construction of three tunnels, built next to each other. The northern tunnel was designed to bring people from England to France. The southern tunnel was to go from France to England. And an additional service tunnel—to be rarely used, only in case of an emergency—was to go in the middle. The estimated cost was $3.6 billion. Once the plan was approved, digging started from each side of the Channel.

3With the help of powerful tunnel boring machines, thousands of workers started digging below the ground. The dirt was moved to above ground before the cement was poured for the tunnel. Even with advanced technology, the work was often difficult. However, with the help of about 15,000 workers, the two sides met in December 1990, and the service tunnel was completed. However, workers never enjoyed a break because two more tunnels remained. The two sides finished the northern tunnel the following year and the southern tunnel a month after that. The digging was done, but then train tracks, electrical equipment, and train stations were needed. Finally, in May 1994, the Channel Tunnel opened. After ten years, $15 billion, and the deaths of ten workers, it was finally finished.

4Today, the Channel Tunnel, or Chunnel, as it is usually called, is 50 kilometers (31 mi) long—39 kilometers (24 mi) of it underwater—and 7 meters (23 ft) in diameter. At their deepest point, the tunnels are 75 meters (246 ft) below the seabed. About 500 trains a day, sometimes going as fast as 160 kilometers per hour (99 mph), move more than 50,000 people between the two countries. The trip takes a comfortable 35 minutes, a noticeable improvement over the 90-minute ferry ride.

Questions 7–9
Questions 7–8 · Multiple choice
Choose the correct letter, a, b or c
Read ¶1–2 and the map, then choose the best answer.
7What information is in Paragraph 1 but not on the map?
a · the names of the two countries
b · Dover, the city in England
c · a label for the English Channel
8What was the middle tunnel to be used for?
a · trains going from France to England
b · storage of extra materials
c · emergencies
Question 9 · Complete the sentence
Write ONE WORD AND/OR A NUMBER from the passage for each answer
Điền một từ và/hoặc một số lấy trong bài.
9Before 1994, people could travel kilometers by boat or plane to cross the English Channel.
Phần 6/8 · 📖 Read · Chunnel ¶3–4 · câu 10–12
The Channel Tunnel: An International Engineering Marvel

1Before 1994, if you wanted to go from France to England, you could make the 34-kilometer (21-mi.) trip across the English Channel by ferry or plane—or by swimming, if you enjoy adventure! For centuries, both the British and the French had thought about connecting the two countries with an underground tunnel. But fear of invasion and funding problems always stopped its construction. This changed in 1985 when the leaders of both countries had a contest to find a company that could plan, fund, and build a tunnel that would stretch the distance between the two countries.

2The engineering company Transmanche Link developed the winning plan. It planned for the construction of three tunnels, built next to each other. The northern tunnel was designed to bring people from England to France. The southern tunnel was to go from France to England. And an additional service tunnel—to be rarely used, only in case of an emergency—was to go in the middle. The estimated cost was $3.6 billion. Once the plan was approved, digging started from each side of the Channel.

3With the help of powerful tunnel boring machines, thousands of workers started digging below the ground. The dirt was moved to above ground before the cement was poured for the tunnel. Even with advanced technology, the work was often difficult. However, with the help of about 15,000 workers, the two sides met in December 1990, and the service tunnel was completed. However, workers never enjoyed a break because two more tunnels remained. The two sides finished the northern tunnel the following year and the southern tunnel a month after that. The digging was done, but then train tracks, electrical equipment, and train stations were needed. Finally, in May 1994, the Channel Tunnel opened. After ten years, $15 billion, and the deaths of ten workers, it was finally finished.

4Today, the Channel Tunnel, or Chunnel, as it is usually called, is 50 kilometers (31 mi) long—39 kilometers (24 mi) of it underwater—and 7 meters (23 ft) in diameter. At their deepest point, the tunnels are 75 meters (246 ft) below the seabed. About 500 trains a day, sometimes going as fast as 160 kilometers per hour (99 mph), move more than 50,000 people between the two countries. The trip takes a comfortable 35 minutes, a noticeable improvement over the 90-minute ferry ride.

Questions 10–12
Questions 10–11 · Multiple choice
Choose the correct letter, a, b or c
Read ¶3–4 and the timeline, then choose the best answer.
10According to the timeline, when was the winning company chosen?
a · April 1985
b · January 1986
c · December 1987
11Why did the workers never enjoy a break?
a · The machines broke down.
b · They still had two more tunnels to dig.
c · The cement was not ready.
Question 12 · Complete the sentence
Write ONE WORD AND/OR A NUMBER from the passage for each answer
Điền một từ và/hoặc một số lấy trong bài.
12About workers helped build the tunnel.
Phần 7/8 · ✔ True or False · Chunnel · câu 13–16
The Channel Tunnel: An International Engineering Marvel

1Before 1994, if you wanted to go from France to England, you could make the 34-kilometer (21-mi.) trip across the English Channel by ferry or plane—or by swimming, if you enjoy adventure! For centuries, both the British and the French had thought about connecting the two countries with an underground tunnel. But fear of invasion and funding problems always stopped its construction. This changed in 1985 when the leaders of both countries had a contest to find a company that could plan, fund, and build a tunnel that would stretch the distance between the two countries.

2The engineering company Transmanche Link developed the winning plan. It planned for the construction of three tunnels, built next to each other. The northern tunnel was designed to bring people from England to France. The southern tunnel was to go from France to England. And an additional service tunnel—to be rarely used, only in case of an emergency—was to go in the middle. The estimated cost was $3.6 billion. Once the plan was approved, digging started from each side of the Channel.

3With the help of powerful tunnel boring machines, thousands of workers started digging below the ground. The dirt was moved to above ground before the cement was poured for the tunnel. Even with advanced technology, the work was often difficult. However, with the help of about 15,000 workers, the two sides met in December 1990, and the service tunnel was completed. However, workers never enjoyed a break because two more tunnels remained. The two sides finished the northern tunnel the following year and the southern tunnel a month after that. The digging was done, but then train tracks, electrical equipment, and train stations were needed. Finally, in May 1994, the Channel Tunnel opened. After ten years, $15 billion, and the deaths of ten workers, it was finally finished.

4Today, the Channel Tunnel, or Chunnel, as it is usually called, is 50 kilometers (31 mi) long—39 kilometers (24 mi) of it underwater—and 7 meters (23 ft) in diameter. At their deepest point, the tunnels are 75 meters (246 ft) below the seabed. About 500 trains a day, sometimes going as fast as 160 kilometers per hour (99 mph), move more than 50,000 people between the two countries. The trip takes a comfortable 35 minutes, a noticeable improvement over the 90-minute ferry ride.

Questions 13–16 · True / False / Not Given
Questions 13–16 · True / False / Not Given
Write TRUE if the statement agrees with the passage, FALSE if it disagrees, NOT GIVEN if there is no information.
NOT GIVEN = the article does not say.
👉 NOT GIVEN = bài không nói tới điều này.
13The final cost of the tunnel was higher than the estimated cost.
True
False
Not Given
14The tunnel boring machines came from Japan.
True
False
Not Given
✓ The article does not say where the machines came from.
15The southern tunnel was finished before the northern tunnel.
True
False
Not Given
✓ The northern tunnel was finished first; the southern tunnel a month after that.
16Less than half of the Channel Tunnel is under the sea.
True
False
Not Given
✓ 39 of the 50 kilometers are underwater — more than half.
Phần 8/8 · EXTRA · ✍ Vocabulary review · câu 17–22
✍ Vocabulary review

Complete the sentences 🚇

Nối từ với nghĩa, hoặc điền từ vào câu — ôn lại từ hôm nay.
Tap a chip, then tap the gap. 🔑 checks your answers.
distancedevelopedcontestskillfearremainsfollowingstep
17The Gotthard Base Tunnel stretches for a of 57 kilometers — longer than the Channel Tunnel.
18The Swiss government the plan to move European products more quickly.
19The Swiss government did not have a to see who could build it. They did it themselves.
20Because tunnel building is dangerous, a of many workers was that they would get hurt.
21An old road tunnel through the mountain still , but it is a longer, more dangerous journey.
22It didn’t officially open until the winter, in December 2016.
✍️ Bài về nhà
📚 Bài tập về nhà · Lesson 3

Trước buổi học sau…

Việc cần làm trước buổi sau — làm ở nhà. Nộp trước hạn: cộng điểm thi đua buổi sau; nộp trễ chỉ được một nửa điểm.
📚 Việc cần làm ở nhà
📒 Ghi vào vở: từ vựng (chép tay)
🔁 Làm lại các câu em làm sai
⭐ Làm phần Extra
🃏 Học từ vựng bài mới
👋 Hẹn gặp em ở Lesson 4! ✍️
Chưa nộp phần nào
© 2026 Thầy Công · thaycong.com